Dam Construction Active
Water Management
25% Completed
Construct a water tank and water trough in night paddock plus water pump Construct a water tank and water trough in night Construct a water tank and water trough in night paddock plus water pump Construct a water tank and water trough in night paddock plus water pump Construct a water tank and water trough in pump... read more
Project Cost: UGX 1.4M
GLAD Commission: UGX 300K 30%
DDE Commission: UGX 100K 10%
UGX 1.8M
Investment
UGX 2.4M
Revenue
133%
ROI
UGX 1M
Loan
UGX 1.8M
Investment
UGX 2.4M
Revenue
133%
ROI
UGX 2.4M
Revenue
133%
ROI
UGX 1M
Loan
UGX 1M
Loan
Installation of water pump
04 tasks included in this milestone.
25% Completed
Value
UGX 600k
Value
15 days
Value
15 days
Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry's standard dummy text ever since the 1500s, when an unknown printer took a galley of type and scrambled it to make a type Lorem Ipsum has been the industry's standard dummy text specimen...
Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry's standard dummy text ever since the 1500s, when an unknown printer took a galley of type and scrambled it to make a type Lorem Ipsum has been the industry's standard dummy text specimen...
You can check the status below:
Applied
Loan application submitted by the farmer.
21 Feb, 23 by: Hurton
Pre-approved
Application pre-approved by the Credit Committee and survey is in progress.
21 Feb, 23 by: Hurton
Survey Completed
Survey of the site completed by the service provider.
21 Feb, 23 by: Hurton
Verified
Details verified and accepted by the farmer.
21 Feb, 23 by: Hurton
Approved
Loan approved by the Credit Committee.
21 Feb, 23 by: Hurton
Accepted
Loan approved by the Credit Committee.
21 Feb, 23 by: Hurton